بازرسی ساخت مخازن تحت فشار مطابق ASME
- توضیحات
- منتشر شده در 21 مرداد 1392
- بازدید: 5440
Pressure vessel manufacturing inspection (ASME)
Duration : 2 days
Course Content :
-Inspector`s duties & responsibilities.
-Material certificate EN10204
-Control of document (IIP,WPS,PQR,WPQ,NDT MAP)
-Control of Material Traceability
-Control of NDT activities & reports
-Control of PWHT & records
-Hydrostatic & peneumatic test
-Control of Name Plate
-Control of surface preparation & painting
-nonconformance reports